Closed Jammu and Kashmir Tenders
- 2026_PWDJK_324512_1 - SUPPLY/FITTING OF COPPER TAIL PIPES FOR OXYGEN AT VARIOUS LOCATIONS AT GOVT. SMGS HOSPITAL, JAMMU.
(closed 25/09/2026)
- 2026_PWDJK_324623_1 - Repair Restoration of Passenger lift of 26 passenger capacity installed at District Hospital Samba
(closed 25/09/2026)
- 2026_PWDJK_324840_1 - Repair Maintenance of 20 Nos Split Air Conditioning Units of 1.5 TR 2 TR capacities installed at Accounts Section Physiology Department Pharmacology Department and Biochemistry Department of GMC Jammu
(closed 25/09/2026)
- 2026_PWDJK_324923_1 - Replacement of 100 mm Sluice Valve and other allied works in pump section of Govt Chest Diseases Hospital Jammu
(closed 25/09/2026)
- 2026_PWDJK_321235_2 - Design, Supply, Installation, Testing and Commissioning of a Solar-Assisted Hybrid Electric FRP Catamaran Capacity 16 Passengers plus 2 Crew with Enclosed Cabin and Petrol IC Engine Backup for Anti-Poaching Operations in The Wular Lake
(closed 25/09/2026)
- 2026_PWDJK_325000_1 - Extension Establishment of Existing Laboratory area in Emergency of GMCH Jammu along with allied works in adjoining areas including upgradation of Trauma area by way of Providing and Fitting of Medical Gas outlets Points Air Oxygen Vacuum along with
(closed 25/09/2026)
- 2026_PWDJK_324983_1 - Extension Establishment of Existing Laboratory area in Emergency of GMCH Jammu along with allied works in adjoining areas including upgradation of Trauma area by way of Providing and Fitting of Medical Gas outlets Points Air Oxygen Vacuum along with
(closed 25/09/2026)
- 2026_PHE_324436_2 - Improvement and Augmentation of Water Supply of various wards of Poonch town and adjoining area by way of replacement of old worn out G.I pipes under District Capex budget 2026-27
(closed 25/09/2026)
- 2026_PHE_324436_1 - Work Upgradation of different distribution of Surankote town including repair of 30000 gallon GSR at Mehta Mohalla under District Capex budget 2026-27
(closed 25/09/2026)
- 2026_PHE_325115_1 - Augmentation of water supply to Hamza Colony B and Gulab Bagh BWO laying and fitting of 50mm dia sub main and distribution network.(under CDF -2026-27)
(closed 25/09/2026)
- 2026_PHE_325197_1 - Providing and fixing of GI pipes at Mominabad Gonipora, ward No. 11 from Masjid Sharief Mominabad to House of Showkat Ahmad Zargar and other incl. testing and commissioning (MPLADS)
(closed 25/09/2026)
- 2026_IFC_325272_1 - Construction of Headworks and defunct irrigation channel (RD 0m to 500m) on Berigam Ladi adjacent to Nallah Vathwathro at Chowgam for providing irrigation facility to village Berigam and Chowgam
(closed 25/09/2026)
- 2026_FD_324832_1 - Renewal of Paint rings marks
(closed 25/09/2026)
- 2026_PDD_322324_1 - Creation of 6.3 MVA 33 11 KVA R Stn at Chassana Tehsil Mahore Block Chassana of Distt Reasi Scheme Code PDDSS2627100648
(closed 25/09/2026)
- 2026_PDD_323371_1 - Replacement of damaged CT/PT unit at FTR HQ BSF Camp Paloura, Jammu on 11KV MU-06 feeder I the jurisdiction of sub division Janipur on turnkey basis
(closed 25/09/2026)
- 2026_PDD_323555_1 - Insertion of Transmission towers at critical locations of 132KV D/C Mirbazar Lisser Transmission line
(closed 25/09/2026)
- 2026_FD_317387_1 - Supply of Soil Humus and Sand and preparation of potting mixture in the ratio of 3 2 1 after sieving Soil humus and sand separating pebbles and other undesirable material and mixing net quantities together in desired ratio and volume followed by fil
(closed 25/09/2026)
- 2026_FD_318155_1 - 1st year Maintenance of 15000 Nos of PB saplings and 2nd year Maintenance of 15000 Nos of PB saplings in Gulabgarh Nursery and 1st year Maintenance of 12000 Nos of PB saplings in Comptt 12aP Gulabgarh Nursery and 1st year Maintenance of 10000 Nos of
(closed 25/09/2026)
- 2026_FD_318387_1 - 2nd year BUC in Kishtwar Range of Kishtwar Forest Division under CAMPA NPV 2026 27
(closed 25/09/2026)
- 2026_FD_319604_1 - 1st year Maintenance of 6000 Nos of PB saplings in Bimalnag 1st year Maintenance of 4000 Nos of PB saplings in Thalnar and 1st year Maintenance of 5000 Nos of PB saplings in Gulabgarh Nurseries in Poly Pots of KFD under CAMPA CA
(closed 25/09/2026)
- 2026_FD_322388_1 - Raising of 20000 Nos in Sangrambhatta and 30000 Nos in Gulabgarh nurseries under BDMP KWAR 2026 27
(closed 25/09/2026)
- 2026_FD_322795_1 - Infrastructure Development for training barracks and Biodiversity Park at Pochhal Kishtwar under CAMPA BDMP KWAR for the year 2026 27
(closed 25/09/2026)
- 2026_FD_323441_1 - Providing and fixing of barbed wire fencing with PCC fence posts and establishment and maintenance of plantation through planting of departmental saplings including casualty replacement beating up protection and all operations necessary to achieve an
(closed 25/09/2026)
- 2026_FD_323594_1 - Raising of 12453 Nos of PB Plants and 13440 Nos of NR Plants in Comptt 17N new Nursery at Padyarana Chichingal of Nagseni Range of Kishtwar Forest Division Under CAMPA CAT KWAR for the year 2026 27
(closed 25/09/2026)
- 2026_PWDJK_322151_1 - Servicing of KTA38-G12 Model 750 KVA capacity DG sets 02 Nos Cummins make installed at Govt SMHS Hospital Srinagar
(closed 25/09/2026)
- 2026_PWDJK_323886_1 - Repairing Rewinding of 20 HP 3 Phase, 415 V 50 Hz 1463 RPM Electric Motor coupled with 12,000 CFM AHU installed in Burn Ward SMHS Hospital, along with allied works
(closed 25/09/2026)
- 2026_PWDJK_323839_1 - Supply, Installation, Testing Commissioning of 01 No. 08 Passenger Elevator at Community Hall, Atam Anand Bhawan Jain Sathanak, Jain Nagar, Ward No 32, Jammu
(closed 25/09/2026)
- 2026_PWDJK_324324_6 - General overhauling of Hot water Generator Servicing of AHUs and Ducting infrastructure along with allied preventive and Breakdown Maintainence works to Central Heating System at Govt. Superspeciality hospital Srinagar
(closed 25/09/2026)
- 2026_PWDJK_324324_2 - General Overhauling of Central Heating System along with allied works at Govt B and J Hospital Srinagar for the season 2026 27
(closed 25/09/2026)
- 2026_PWDJK_324324_1 - General overhauling of Hot Water Generator of central heating plant with allied works at GMC Srinagar.
(closed 25/09/2026)
- 2026_PWDJK_324324_5 - General overhauling of air handling units hot water generator of Central heating plant with allied mechanical works at Govt. Psychiatric disease hospital Srinagar
(closed 25/09/2026)
- 2026_PWDJK_324324_3 - Preventive and Breakdown Maintenance of Central Heating System installed at Govt. SMHS Hospital Srinagar for the Heating Season 2026 27
(closed 25/09/2026)
- 2026_PWDJK_324324_8 - General overhauling of Hot Water Generators Along with allied Preventive and Breakdown Maintenance Works to Central Heating System at Govt. Chest Disease Hospital Srinagar.
(closed 25/09/2026)
- 2026_PWDJK_324324_7 - General overhauling of 15 lac kcal hr and 20 lackcal hr hot water generator along with allied works at Govt LD Hospital Srinagar
(closed 25/09/2026)
- 2026_PWDJK_324324_4 - Annual Servicing Preventive maintenance repair and Replacement Works to be carried out for the Central Heating System at 500 Bedded Govt Childrens Hospital Bemina Srinagar
(closed 25/09/2026)
- 2026_PWDJK_324363_2 - Electrical Works pertaining to Central Heating System installed at Govt.SMHS Hospital Srinagar for the year 2026 27
(closed 25/09/2026)
- 2026_PWDJK_324363_1 - Replacement of old damaged panel by way of supply installation testing and commissioning of floor mounted power distribution electric control panel for boiler house at govt. bone and joint hospital srinagar
(closed 25/09/2026)
- 2026_HAUDD_320304_1 - Supply, Installation, Testing and Commissioning of 02 Nos. Boom Barrier 6mtr. Long at General Bus Stand Jammu including wiring, hardware etc. (Complete Job)
(closed 25/09/2026)
- 2026_PWDJK_322569_1 - Construction of Mechanized Windrow Composting unit at Fruit and Vegetable Market Aglar Shopian. (Design, Supply, Installation, Testing and Commissioning of 05 Ton Per Day Capacity Mechanized Windrow Composting Unit at Fruit and Vegetable Market Aglar
(closed 25/09/2026)
- 2026_PWDJK_324329_1 - Repair and Periodic Maintenance of JCB 3DX Backhoe Loader 1500765 for Snow Clearance Operations at Doda
(closed 25/09/2026)
- 2026_PWDJK_325182_1 - MACADAMIZAION OF KHUMRIYAL VAWOORA (BALANCE PART)
(closed 25/09/2026)
- 2026_PWDJK_324727_1 - Repairs to Backhoe Loader JCB 4DX No 1414628
(closed 25/09/2026)
- 2026_PWDJK_324731_1 - Repair Periodical Maintenance to the Snow Cat 1478 B Preet 90HP
(closed 25/09/2026)
- 2026_PWDJK_324734_1 - Repairs Servicing to Snow cat 2014 Snow Clearance Machine
(closed 25/09/2026)
- 2026_PWDJK_324761_1 - Repair Periodical Maintenance to the Wheel loader Liugong No 30105
(closed 25/09/2026)
- 2026_PWDJK_324742_1 - Repair to the Wheel loader Liu gong No 106
(closed 25/09/2026)
- 2026_PWDJK_324751_1 - Repair to the Backhoe loader Case 01939
(closed 25/09/2026)
- 2026_FD_325209_1 - REPAIR AND RENOVATION OF OFFICE AND RESIDENCE OF RANGE OFFICER MAHORE HQ DARMARHRI 2026-27
(closed 25/09/2026)
- 2026_FD_325215_1 - CONSTRUCTION OF CHAINLINK FENCING AROUND DIVISION OFFICE COMPLEX TO PROTECT FROM ENCROACHMENT UNDER CAPEX FOR THE YEAR 2026-27
(closed 25/09/2026)
- 2026_PWDJK_320172_1 - Consultancy Services for Construction of Kitchen block behind Circuit House Srinagar
(closed 25/09/2026)